Quick Answer

You can engage an electrician to conduct a site audit and they may be able to find ways to reduce the site power consumption to below the 100 Amp limit.

Advanced meters are industry standard and since December 2017, and regulatory obligations require that all new meter installations or replacements require an 80 Amp protection fuse.

The advanced metering requires a 100 Amp meter protection device, an 80 Amp fuse will allow over the 100 Amps to meet the customers' 100 Amp connection demand, but at the same time offer the correct protection to meet regulatory obligations.